Development Methodologies
The SDLC (software development life cycle) is the sequence of stages a product goes through: planning, requirements, design, implementation, testing, deployment, maintenance. Waterfall goes through them once, in order, which suits fixed and well-known requirements. Agile repeats them in short iterations and adapts the plan to feedback. Scrum and Kanban are the two most common ways to practice Agile: Scrum works in fixed-length sprints with defined roles and events, Kanban is a continuous flow of tasks on a board with limits on work in progress.
Details
Waterfall vs Agile
| Waterfall | Agile | |
|---|---|---|
| Process | Stages in sequence, each completed once | Short iterations, each through all stages |
| Requirements | Fixed up front | Change between iterations |
| Feedback | At the end | After every iteration |
| Testing | A late separate stage | Continuous, from the start ("shift left") |
| Strengths | Predictable plan, budget and documentation | Adapts to change, early value, issues found early |
| Weaknesses | Changes are expensive, problems surface late | Scope is harder to fix, needs constant collaboration |
Shift-left testing means moving testing earlier in the cycle: defects found during development are cheaper to fix than after release.
Scrum
Per the Scrum Guide (2020 edition):
- Roles (accountabilities): Product Owner (orders the Product Backlog, maximizes value), Scrum Master (helps the team follow Scrum, removes impediments), Developers (build the increment).
- Events: the Sprint (up to a month, usually 2 weeks) contains Sprint Planning, the Daily Scrum (15 minutes), the Sprint Review (the increment shown to stakeholders) and the Sprint Retrospective (how to work better).
- Artifacts: Product Backlog, Sprint Backlog, Increment.
- Estimation is not prescribed by the guide; teams often use story points (relative effort) and planning poker.
Kanban
- A board with columns for workflow stages (To Do → In Progress → Review → Done).
- WIP limits: a column can hold only N tasks, so the team finishes work before starting new work.
- No fixed iterations or roles; tasks are pulled when there is capacity.
- Measured by lead time (request to done) and cycle time (start to done).
Scrum vs Kanban
| Scrum | Kanban | |
|---|---|---|
| Cadence | Fixed sprints | Continuous flow |
| Roles | Product Owner, Scrum Master, Developers | Not prescribed |
| Changes | None that endanger the Sprint Goal | Any time, by reordering the queue |
| Limits work | By sprint capacity | By WIP limits per column |
| Fits | Product development with planning | Support, operations, a stream of small tasks |
Follow-up Questions
- What is velocity? The amount of work (in story points) a team completes per sprint; used to plan the next sprints, not to compare teams.
- What is the Definition of Done? A shared checklist an increment must meet: reviewed, tested, documented, deployed to staging.
- What if the Sprint scope turns out to be too big? The scope is renegotiated with the Product Owner while the Sprint Goal stays; a Sprint is cancelled only when its goal becomes obsolete, and only by the Product Owner.
- What is backlog refinement? The ongoing work of splitting upcoming items and adding detail and size, so they are ready for Sprint Planning; it is not a Scrum event.
Common Mistakes
- Calling Agile a methodology: it is a set of values and principles (the Agile Manifesto); Scrum and Kanban are ways to apply them.
- "Development Team" and "ceremonies": the 2020 Scrum Guide says Developers and events.
- Treating the Daily Scrum as a status report to the manager: it is the Developers' check of progress toward the Sprint Goal and their plan for the next day.